PadelWatch: padel score tracker for Apple Watch
Wear your watch and play. PadelWatch names each shot, from drives and volleys to the bandeja and víbora, and keeps the match score with golden point at 40-40.
PadelWatch in short
- What it is
- An Apple Watch app that tracks padel shots and keeps the match score. On the App Store it's listed as "Padel Score Tracker-PadelWatch".
- Who it's for
- Padel players who wear an Apple Watch and want shot names and a golden point score on their wrist, with the phone off court.
- What it tracks
- Drives, volleys, lobs, bandejas, víboras and smashes, each rated good, medium or poor. Estimated speed in mph, the padel score with golden point and tiebreaks, heart rate and calories.
- What it costs
- Free to download, and shot tracking and scoring on the Apple Watch are free. The iPhone app, with your past matches and trends, needs a subscription.
- What you need
- An Apple Watch on watchOS 26.2 or later, paired with an iPhone on iOS 26.2 or later.
What your watch picks up on court
Padel shots by name
Drives, volleys and lobs off both sides, plus the overheads: bandeja, víbora and smash. Your watch's motion sensors pick them up as you play.
Good, medium or poor
Each swing gets one of three ratings. When the match ends, your watch shows how your swings split between them.
Real padel scoring
15, 30, 40 and a golden point at 40-40. Sets to six games, won by two, a tiebreak at 6-6 and best of three. Tap Us or Them to add a point, and undo if you slip.
Estimated speed in mph
A top and average figure in mph for each match. The watch estimates it from how fast your wrist turns through the shot.
Apple Health workouts
With your permission, each match is saved to Apple Health as a workout with heart rate and calories.
Results on your iPhone
Look back at past matches and results, and share a match card after you play. The iPhone app needs a subscription.
How it works
- Start a session in PadelWatch on your Apple Watch before the first serve.
- Get on with the match. Between points, tap the score screen to give the point to Us or Them.
- When the match ends, your watch shows your shot mix, swing ratings and estimated speed. The match then shows up in the iPhone app.
Read the full guide: how to track padel on Apple Watch.
Questions
Can an Apple Watch track padel?
Yes. PadelWatch is a padel app built for Apple Watch. It reads your shots from wrist motion, keeps the padel score and records each match as a workout.
Can I keep padel score on my Apple Watch?
Yes. Tap Us or Them to add a point. PadelWatch uses golden point scoring. At 40-40 the next point wins the game, with no advantage. Sets go to six games, won by two, with a tiebreak at 6-6. Matches are best of three.
Is there a free padel app for Apple Watch?
PadelWatch costs nothing to download. Shot tracking and scoring on the watch are free. On iPhone you need a subscription to see your matches, trends and extra stats such as estimated top speed.
Can I leave my phone off court?
Yes. The watch tracks shots and score on its own. The match copies across to your iPhone once the two reconnect.
Does it work with my Apple Watch?
It does if the watch runs watchOS 26.2 or later. The PadelWatch app on your iPhone asks for iOS 26.2 or later.
How accurate is the speed number?
Treat it as a guide. PadelWatch estimates how fast your racket moves from your wrist motion. Ball speed isn't measured.
What happens to my data?
The privacy policy says PadelWatch tracks your shots on your Apple Watch and iPhone and uses no third-party analytics. Workouts reach Apple Health only with your permission, and RevenueCat processes anonymous purchase receipts. The full details are in the PadelWatch privacy policy.